Challenges
Consultancy Services for Detailed Engineering Design ,Environmental and Social Impact Assessment, Preparation of Tender Documents and Construction Supervision of the Kitengule Bridge and its Approach Roads (18km) to bitumen standard in Kagera Region
Brief Description
Total Length : L=18km
80m steel truss bridge
2 Nos. 40m Reinforced Concrete Bridge
Description
Output
- Design review of bridge and drainage structures
- Design review of road works and pavement layers
- Supervision of the works contract to ensure that the works comply with the approved design, drawings, specifications, conditions of contract and sound engineering practice.
- Approval of Contractor’s working drawings
- Preparation of final construction report and as built drawings of all completed works.
- Preparation of the project completion report.
- Supervision of maintenance activities during the defects liability period